Step 3: Review the Rate Timeline
Once scheduled, the Rate Timeline section shows two versions side by side:
- Scheduled — the new version, labeled with its effective date (e.g., "Effective Dec 16, 2026"). This starts as an exact copy of the current rate.
- Current / Active — the version currently in effect ("Original"), which keeps applying until the scheduled date arrives.