Save for Later
This guide was created with Scribe in
39 seconds.
Sign in and create your own!
How to Submit a Construction Change Order (CO11)
0 step
E-Builder
Gmu
1
Click "Processes"
Zoom Saved
2
Click this button field.
Zoom Saved
3
Click "Construction Change Order (CO11)"
Zoom Saved
4
Download "HECO-11 Construction Change Order" and complete spreadsheet.
Zoom Saved
5
Complete all required fields starred in red.
Zoom Saved
6
Add all FCOs that should be bundled into this change order. Click "FCO"
Zoom Saved
7
Click Attach Existing button.
Zoom Saved
8
Ensure that all FCOs that are going to be bundled are in pending status and in the FCO HOLD STEP.
Zoom Saved
9
Click the checkbox next to all FCOs that are going to be bundled into the change order.
Zoom Saved
10
Click Attach Existing button.
Zoom Saved
11
Click this button.
Zoom Saved
Have something to say?
Create an account to leave messages for the author to see!
Create an account
Feedback
This Scribe is in tip-top shape!
Leave feedback if there are any issues with this Scribe