How to connect one track with another in your campaign flow chart. | Scribe

    How to connect one track with another in your campaign flow chart.

    1
    Open your campaign.
    2
    Hover of a campaignpoint until the plus-icon appears.
    3
    Click the plus-icon and drag and drop it on the campaignpoint you want to connect.
    4
    Choose the delay inbetween the campaignpoints.
    5
    Select the criteria.
    6
    Select the condition.
    7
    Click "Save"
    8
    You have successfully connected the campaigntracks.