How to Add a Plan in Kwant
Support Kwant
35 steps
3 minutes
Kwant
1
Navigate to [https://app.kwant.ai/projects](https://uat.kwant.ai/projects)
2
Go to the project.
3
Select ZoneIQ from the left navigation bar
4
Click "Add Plan"
5
Create buildings
6
Add floor
7
Click upload plan to upload a floor plan
8
This icon means the plan has not been calibrated yet. Calibration is mandatory
9
Can add multiple floors
10
Click "Upload Plan"
11
Click Delete icon to delete floor plan
12
Click "Delete" to confirm delete
13
Click "Save"
14
Need to calibarate the plan now. Click a starting point to calibrate
15
Click end point to draw a horizontal line
16
Enter the value of line just drawn in above steps
17
select the dimension
18
Click "Next"
19
Click "Add New Zone"
20
Enter the name of the zone
21
select a geometry of the zone
22
Click this draw icon to draw a zone.
23
Draw a zone on plan
24
can select if its a muster zone
25
select zone productivity
26
select zone status
27
select date range for status
28
select assigned companies for that zone
29
Click "Next"
30
Click "Add New Sensor" to add Kwants
31
Click Next
32
Click "Add New Gateway" to add a gateway
33
Select gateway
34
Click "Save"
35
Green tick will appear which means the plan is calibrated.
How to Add a Plan in Kwant
Support Kwant
35 steps
3 minutes
Kwant
1
Navigate to [https://app.kwant.ai/projects](https://uat.kwant.ai/projects)
2
Go to the project.
3
Select ZoneIQ from the left navigation bar
4
Click "Add Plan"
5
Create buildings
6
Add floor
7
Click upload plan to upload a floor plan
8
This icon means the plan has not been calibrated yet. Calibration is mandatory
9
Can add multiple floors
10
Click "Upload Plan"
11
Click Delete icon to delete floor plan
12
Click "Delete" to confirm delete
13
Click "Save"
14
Need to calibarate the plan now. Click a starting point to calibrate
15
Click end point to draw a horizontal line
16
Enter the value of line just drawn in above steps
17
select the dimension
18
Click "Next"
19
Click "Add New Zone"
20
Enter the name of the zone
21
select a geometry of the zone
22
Click this draw icon to draw a zone.
23
Draw a zone on plan
24
can select if its a muster zone
25
select zone productivity
26
select zone status
27
select date range for status
28
select assigned companies for that zone
29
Click "Next"
30
Click "Add New Sensor" to add Kwants
31
Click Next
32
Click "Add New Gateway" to add a gateway
33
Select gateway
34
Click "Save"
35
Green tick will appear which means the plan is calibrated.